TECHNICAL INDUSTRIAL
Caisteal Builders has an extensive background in working in T.I. work that spans across many different industries




MADE GOODS
CITY OF INDUSTRY, CA
Design-Build Project:
-
Demolition of the first floor 10,000 s.f. of office and build out a 10,000 unfinished existing mezzanine.
-
Exposed beautiful wood glue lam beams on the underside of the mezzanine for the 1st floor Office T.I. and for the 2nd. Floor T.I. build out also.
Added:
-
(2) new stairs to the mezzanine. (1) standard accessible stair in a rated stair shaft. (1) decorative stair access from the open office with cable railings.
-
1st. floor restrooms remodeled the existing restrooms to make ADA compliant with solid walls and door in lieu of toilet partitions.
-
New open concept Oasis/Break Room area with refrigerators, water filtration systems, micro waves, dishwasher and vending machines.
-
2nd. Floor new restrooms with solid walls and doors in lieu of the toilet partitions.
-
2nd. Floor did not have any exterior windows. Installed (12) exterior windows to open up the space with natural light. Structural design and installed structural steel strong backs, cut openings with champher edges and no over cuts.
-
New warehouse restrooms and electrical distribution for the product advertising lighting and filming area.
EXTERIOR:
-
New ADA compliant main building entry with acid wash concrete walk path, ADA parking and access to the public right of way.
-
New masonry with structural steel roof trash enclosure.




IRVINE MEDICAL ARTS CENTER
IRVINE, CA
-
65,000 sqft ground up 3-story medical office building
-
Variable air volume (V.A.V.) system
-
(2) Elevators
-
Type A Level finishes
-
Limestone lobby/corridor flooring
-
Crown molding
-
Glass/stainless steel handrails
-
High performance glass
-
Electrical is multi-metered for each suite and for all other utility services




LONG SWIMMING POOLS
YORBA LINDA, CA
-
28,500 sq ft
-
10,000 sq ft of Type A office with glass hand rail main lobby stair, granite receptionist counter, and interior design finishes throughout
-
Field support offices that feed off and face the warehouse with scheduling, dispatch, and material ordering personell
-
18,500 sq ft warehouse for material and equipment storage, with a 24' clear height




TRINITY BROADCASTING
COSTA MESA, CA




MCCARTHY STUDIOS
LOS ANGELES, CA
Creative Art Production Company
-
Remodel of a 1972 Dock High Concrete Tilt-up 80,000 s.f. building
-
Added: New 10,000 s.f. concrete poured in place 300 lbs per s.f. structural mezzanine with concrete tilt-up walls for sheer panels
-
New production paint rooms, casting rooms and molding rooms with 12' x 121 overhead doors to the warehouse, climate control, exhausting and lighting
-
Remodeled: 20,000 s.f. of existing office mezzanine, open ceiling concept, new wood T & G finished floors, owners creative art lab




DESERT REIGN ASSEMBLY OF GOD
DOWNEY, CA
-
40,000 sqft ground up concrete tilt-up 2 story church
-
Large sanctuary which included an acoustical drop soffit ceiling system
-
Lighting
-
Stage
-
Support Offices
-
Child care facilities and outside play ground
-
Demolished an old retail center from the 50's and converted the site to a new updated church facility